M · IN MOTION
In motion.Live from the studio.
The control room. Live timecode, last deploy, houses in motion, signed and dated decisions. The studio kept in the open instead of behind the pitch.
TIME
DXB— —:— —
BKK— —:— —
LAST DEPLOY18 days ago2026-05-17 13:42:34 UTC
HOUSES02 live · 01 in motion4 total
H · HOUSES IN MOTION
Status snapshot.
- 01AVAIn productionLIVE
- 02Linxio AiIn productionLIVE
- 03— · — · —BuildIN BUILD
- 04+VenturesReservedRESERVED
D · DECISIONS LOG
Signed and dated.
- 2026-05-16/in-motion control room shipped.BY Studio
- 2026-05-16/hive and /jobs published as real routes (was: redirects to home anchors).BY Studio
- 2026-05-16Voice direction locked: "operators" and "houses" as proprietary nouns.BY Studio
- 2026-05-15Awwwards push started. Site of the Month posture taken.BY Studio
- 2026-05-10Platform modularization sprint D begins.BY Engineering
- 2026-05-07Postgres 17 → 18 migration complete on production.BY Engineering
- 2026-05-03Marketing CMS live on cms.ops.avahive.com (Payload v3.84).BY Studio
- 2026-05-01Domain consolidation on avahive.com complete.BY Studio
- 2026-04-27AVA platform V3 wave 1 (shell + launchpad) ships.BY Engineering
Recorded by the studio.